New Fire Plan Fees

Fire Fees Banner (1)

The Woodland Fire Department's Plan Check and Inspection Fee Schedule was updated on July 1, 2025, to reflect the new fiscal year fees. The revised fees will take effect on July 1, 2025.

We are sharing this information with the community to ensure transparency. The updated fee schedule reflects the ongoing effort to align our services with current standards and community needs.

Please allow 14 business days for the review of each plan submitted.

PLAN CHECK / REVIEW FEES

CIVIL ENGINEERING

Engineering Site Plan with 3 or Less Hydrants (Commercial)$1,581
Engineering Site Plan with 4 or More Hydrants (Commercial)$1,763
Engineering Site Plan Perimeter – Onsite or Offsite Improvements/Fencing/Gates/Architectural Site Plan$816
Residential Single Family Dwelling Gate Plan and Inspection (Private Dwelling)$627
Design Review / Consultation Per Hour$236
Alternate Method Request (AMMR)
$855


NEW BUILDING

New Construction – Commercial – 1 - 10,000 sq. ft. $1,765
New Construction – Commercial – 10,001 - 20,000 sq. ft. $2,730
New Construction – Commercial – 20,001 – 50,000 sq. ft. $3,848
New Construction – Commercial – 50,001+ sq. ft. - $3,847 +$0.10 Per Square Foot$3,847+ .10 per ft2


TENANT IMPROVEMENTS

Demolition Permit - No TI$573
Tenant Improvement - 1-10,000 sq. ft.$1,040
Tenant Improvement - 10,001 - 20,000 sq. ft.$1,447
Tenant Improvement - 20,001 - 50,000 sq. ft.$2,513
Tenant Improvement - 50,001+ sq. ft. - $2,512 +$0.07 Per Square Foot$2,512 + .07 per ft2


FIRE SUPPRESSION SYSTEMS

Stationary Fire Pump - Add-on or Stand-Alone Review with Inspection$1,933
Clean Agent Extinguishing System or Equal $1,610
Commercial Kitchen Hood System – Per system$924
Residential Sprinkler System (Custom) $1,015
Residential Sprinkler System (Production / Subdivision) Per plan$714
Residential Sprinkler System Remodel$805
Water Supply Tank - Commercial$968
Existing Fire Sprinkler System Minor Modifications (Add/Modify) - 10 or Less Fire Sprinklers$301
Fire Sprinklers - Commercial - 1-99 heads$1,439
Fire Sprinklers - Commercial - 100-199 heads$1,813
Fire Sprinklers - Commercial - 200+ heads$2,778
Fire Sprinklers - Commercial - TI - 1-99 heads$1,400
Fire Sprinklers - Commercial - TI - 100-199 heads$1,586
Fire Sprinklers - Commercial - TI - 200+ heads$1,772
Fire Standpipe System$1,727
Riser Connection Stub-In$496


FIRE ALARM SYSTEMS

Fire Alarm - 1-25 devices$1,224
Fire Alarm - 26-50 devices$1,398
Fire Alarm - 51-100 devices$2,539
Fire Alarm - 100+ devices$3,207
Fire Alarm System Panel Swap Out$567
Fire Alarm Control Panel Communication Conversion$839
Fire Alarm System (Existing) Minor Modifications (Add/Modify 10 or Less Devices)$597
Gas Detection System – Stand Alone (i.e. CO2 Monitoring. Medical Gases, etc.)$1,208
Smoke Control or Smoke Exhaust System$3,227


TANKS AND HAZMAT

Above ground Tank Install - Commercial (Flammable & Combustible Liquids)$992
Medical Gas Systems$1,020
Enhanced Vapor Recovery Systems$563
Hazardous Materials Review - Per Hour $319 per hour
Hazardous Materials Inspection - Per Hour$187 per hour
LPG Propane Tank Install Over 1,000 Gallons (with/without generator)$1,004
LPG Propane Tank Install Under 1,000 Gallons (with/without generator)$691
Commercial Tank Removal Permit$534
Underground Tank (Flammable & Combustible Liquids)$1,189


RACK / SHELVING / HIGH PILED STORAGE

Rack/Shelving/High Piled Storage: 1 - 10,000 Square Feet$1,296
Rack/Shelving/High Piled Storage: 10,001 - 20,000 Square Feet$1,552
Rack/Shelving/High Piled Storage: 20,001 - 50,000 Square Feet$1,961
Rack/Shelving/High Piled Storage: 50,000 Square Feet - $1,967 + $0.03 per sq. ft. over 50,000$1,967 + .03 per ft2


SPRAY BOOTH

Spray Booth with Extinguishing System $1,275


SOLAR & ENERGY STORAGE SYSTEMS (ESS)

Commercial Solar (Rooftop)$771
Commercial Solar (Ground)$771
Residential Solar (Ground)$380
Commercial ESS$2,304
ESS Master Plan Subdivision Homes – Per Home$461 per home
ESS Production Homes – Per Home$307 per home
ESS Residential $640


OTHER

Combustible Dust Collection System$408
Temporary Certificate of Occupancy (up to 90 Days) - New Building$914
Temporary Certificate of Occupancy (Model Homes with Sales Offices, Design Studios, or the like)$922
Emergency Responder Radio Coverage (ERRCS)$1,717
Plant Extraction Systems$1,147
Cell Tower (Outside Roof, Pole, Etc.) (Site Equipment Only - No Hazmat or Generator)$690
Temporary Sales Trailer - Per Trailer $760 per trailer
Temporary Building Use - Existing Building Seasonal Use/Special Circumstance$760
Carbon Dioxide (CO2) Beverage System$684
Inspection, testing and maintenance report fee$31

**The purpose of this fee is to cover all costs incurred by the City for processing, reviewing, and drafting all kinds of major development-related documents. These costs include, but are not limited to, attorney, engineering, environmental, planning, and financial costs. Moreover, these costs may result from the work of employees or independent contractors and consultants to the city. City staff hourly fees cover costs for direct labor, maintenance, operation, and overhead.

GENERAL / MISCELLANEOUS

Failure to Prepare/Cancel/Re-inspection$212
Administrative Citation Ordinance Fee – Citation #1 - (*per violation) - WMC 9.20.030(B) $101
Administrative Citation Ordinance Fee – Citation #2 - (*per violation) - WMC 9.20.030(B) $202
Administrative Citation Ordinance Fee – Citation #3 (and subsequent citations) - (*per violation) - WMC 9.20.030(B)$505
Weed Abatement Non-Compliance Administrative Fee (1 Hour Minimum in Addition to Cost of Abatement)$359


NO CHARGE SERVICES

Addressing Consultation
Public Hearing Notice, Capital Improvement Projects Preplanning
Evacuation Plan Review/Fire Drill Monitoring
Pre-Planning Application Consultation Meeting
Speed Control Reviews
Street Closure Reviews
Environmental Impact Reviews


If you need assistance calculating or determining fire plan check fees, please contact 

Samantha Corral at 530-661-5872 or email Fire.Plans@cityofwoodland.gov.