Phase: Construction
Anticipated Completion of Construction: Winter 2025
Project Description:
CIP 24-02 is the ninth phase of a multi-year project where Engineering and Operations staff annually identify locations around the City that have the greatest occurrence of water main and water lateral breaks and leaks, and prioritize these locations for repair and replacement. The areas prioritized for replacement in 2025 are in the vicinity of Cross Street between East Street and West Street and College Street between Pendegast Street and Lincoln Avenue. In total, approximately 6,000 feet of new water distribution mainline will be installed in the street to replace the existing 60 to 105-year-old potable water distribution infrastructure.
The existing sewer system within the Project vicinity consists of six-inch and eight-inch (6” & 8”) diameter vitrified clay pipelines in the street. These sewers vary in age and condition with some pipes having been installed in 1900. It is anticipated that the Project will replace any significantly defective laterals and sections of mainlines via open-cut trenching including replacement of several segments of sewer pipe.